- Report #: NT VVS 039
- Approved: November 1985
Abstract
This Nordtest method is designed to ascertain the maximum water-flow a gully can discharge before backing-up, leakage, noise etc. occurs. Max. discharge capacity from floor and through side-inlets are measured.
Categories and tags